1.2 MW Solar Power Plant in Chernihiv Region
A ground-mounted solar power plant with a total capacity of 1.2 MW was built in Chernihiv Region in two 600 kW phases to generate electricity under the feed-in tariff.
Alteco acted as the EPC contractor, managing the project from site assessment and design through to construction, commissioning and commercial operation.
Key Specifications
Solar Plant Capacity
1.2 MW
Location
Chernihiv District, Chernihiv Region
Alteco’s Role
EPC
Commissioned
Two 600 kW phases
Year Completed
2019
Solution
The project was delivered under an EPC model.
Alteco handled the technical preparation and design, coordinated the grid connection, organised procurement and construction, tested and commissioned the plant, and completed the procedures required to begin commercial power generation.
Preparation, Design and Grid Connection
The team assessed the site and the previously issued technical connection requirements, created a 3D model of the future solar power plant and prepared the documents needed to obtain urban planning requirements.
Design and cost documentation was developed for the plant and its grid connection, including monitoring, video surveillance, relay protection and automated commercial electricity metering systems.
Alteco also supported the process of securing bank financing for the project.
Supply, Construction and Commissioning
Technical specifications for the supply of equipment and materials were prepared for the manufacturers.
Alteco organised delivery, quality control and on-site acceptance, carried out construction and installation, and completed testing, commissioning and equipment setup.
Commercial Power Generation
Following technical commissioning, the project completed the regulatory stage: a power generation licence and feed-in tariff were obtained, and agreements for electricity distribution, transmission, metering and purchase and sale were prepared.
The facility first entered trial operation and then commercial operation. The documents required for an agreement with the Guaranteed Buyer were also prepared.