A 121.2 kWp hybrid solar power plant with a 130.56 kWh energy storage system for the Solli Plus auto centre in Chernihiv. Actual generation: 91.3 MWh per year, covering 85% of consumption.
121.2 kW
Solar Power Plant + Energy Storage System
2025
A 1.2 MW commercial solar power plant in Podilsk delivered by Alteco as a full-cycle EPC project — from design and equipment supply to commissioning and commercial operation.
1.2 MW
Solar Power Plant
2019
A 140 kWp rooftop grid-tied solar power plant for the Ternopil Hotel. The system generates 120,740 kWh per year and covers 50% of the facility’s electricity consumption.
140 kW
Solar Power Plant
2024
A 620.73 kW rooftop solar power plant for the Blockbuster shopping and entertainment centre in Kyiv. The plant generates 549.1 MWh per year and covers approximately 15% of the facility’s electricity consumption.
621 kW
Solar Power Plant
2025
A 1.2 MW ground-mounted solar power plant in Chernihiv Region, delivered by Alteco under an EPC model. Two 600 kW phases were commissioned for commercial operation.
1.2 MW
2019
Grid-Tied Solar Power Plant
A 52 kW hybrid solar power plant and a 250 kW / 480 kWh energy storage system for KOTLOGAZ, a manufacturing company in Kremenchuk. The system provides backup power for a 100 kW load for up to 4.8 hours.
2026
Solar Power Plant + Energy Storage System
Solar: 52 kW / Energy Storage: 480 kWh
A 600 kW commercial solar power plant in Kirovohrad Region, delivered by Alteco under an EPC model with full support through to commercial operation.
600 kW
2023
Grid-Tied Solar Power Plant
A 201 kW rooftop solar power plant for the Kryshtaleve Dzherelo health resort with zero-export control. Estimated generation: 191,162 kWh per year.
201 kW
Grid-Tied Solar Power Plant
2024
Гібридна СЕС для готелю. Забезпечує повну роботу під час відключень до 8 годин.
150 кВт
2020
General questions and CP
info@alteco.in.uaMon–Fri, 9:00–18:00
+38 (067) 505 95 36We respond within 2 hours