A 121.2 kWp hybrid solar power plant with a 130.56 kWh energy storage system for the Solli Plus auto centre in Chernihiv. Actual generation: 91.3 MWh per year, covering 85% of consumption.
121.2 kW
Solar Power Plant + Energy Storage System
2025
A 1.2 MW commercial solar power plant in Podilsk delivered by Alteco as a full-cycle EPC project — from design and equipment supply to commissioning and commercial operation.
1.2 MW
Solar Power Plant
2019
A 140 kWp rooftop grid-tied solar power plant for the Ternopil Hotel. The system generates 120,740 kWh per year and covers 50% of the facility’s electricity consumption.
140 kW
Solar Power Plant
2024
A 620.73 kW rooftop solar power plant for the Blockbuster shopping and entertainment centre in Kyiv. The plant generates 549.1 MWh per year and covers approximately 15% of the facility’s electricity consumption.
621 kW
Solar Power Plant
2025
Система зберігання енергії Huawei LUNA для логістичного центру. Забезпечує безперебійну роботу підйомників та конвеєрів при відключеннях.
100 кВт
сонячні електростанції (СЕС)
10 років
Промислова СЕС для металообробного підприємства. Знизила річні витрати на електроенергію на 62%.
800 кВт
2025
Промисловий об’єкт